CALL US TODAY 01480 276620 Independent UK licensee & installers of the Acrylicon® flooring system Get In Touch

About The Project

With the capacity to hold 34,988 supporters, the Riverside Stadium is the home of Middlesbrough Football Club.

The main area of concern for their flooring solution was for a long-lasting resin flooring that’s able to remain strong and robust.

About Middlesbrough Football Club

Based in North Yorkshire, Middlesbrough FC is a football club with a long history. Formed in 1876, they have played at the Riverside Stadium since 1995, their third ground since turning professional in 1889.

Acrylic Resin Flooring

Not only did the stadium require long-lasting resin flooring that looked aesthetically pleasing, but it also needed to remain resilient to millions of footfalls.

The flooring needed to be installed quickly and would have to handle being cleaned up after 30,000 people, 40–50 times a year.

Making the wrong flooring decision would have proven a costly operation to resolve for the football club.

To ensure peace of mind, we showed the club an example of Acrylicon flooring that had been installed 15 years earlier in Norway.

Although the flooring was over 10 years old, it remained as good as new and was incredibly easy to keep clean.

We spent time discussing the different features of Acrylicon flooring, highlighting the fact that all systems come with a fast curing and installation time, to ensure the project would be done quickly.

We also emphasised the longevity, the several aesthetically pleasing colours, and the non-stick surface that the club could adopt.

The hygienic resin flooring the club opted for was one that prolonged the floor’s lifespan and one that was robust.

The Results

A long-lasting resin flooring that’s both hygienic and durable was at the heart of this project, to withstand the high levels of footfall at the Middlesbrough stadium.

In addition, with the flooring being used by so many, the acrylic resin flooring needed to be aesthetically pleasing, as it would be one of the first things the fans see.

Project facts: 4,000 m² of Acrylicon Flake System flooring laid at approximately 1–2mm thick · the overall construction of the Riverside Stadium took only 32 weeks · 24 years and over 200 million footfalls later, not one penny spent on maintenance.

Now, 24 years and over 200 million footfalls later, the acrylic flooring is still performing the precise job that it was bought for, without one penny spent on maintenance.

Here at Acrylicon UK, we listen to our clients’ needs to deliver solutions that match their unique requirements.

For long-lasting and hygienic resin flooring that allows your brand to stand out, talk to an expert today.

Acrylicon Flake System flooring on the Riverside Stadium concourse Long-lasting resin flooring at Middlesbrough Football Club